Derrick Lay Vessel "CASTORO OTTO" double joint study

  • Elaboration of design for the double-joint system on two decks above the firing line compartment.
  • Re-arrangement of helicopter deck.
  • Feasibility study for the arrangement of a 5000 tons revolving crane (at present 2400 tons lifting capacity) including trim and stability computations and local strength.
  • Re-arrangement of mooring system.
  • Investigation on speed and propulsion parameters and arrangement of Schottel propulsion units to increase vessel speed.
  • Onboard trim and stability software
  • Several upgrading and minor conversions
  • Tie in study and installation